An unattributed industrial release sends sulfuric acid down the river overnight, and six student teams run the six drinking-water plants that draw from it. Each team computes its own neutralising dose from its own certificate of analysis - a new lot in every round after the first - and both under-dosing and over-dosing send water to the mains that should not have gone there. Runs in 49 minutes as a single period (Rounds 1, 3, and 4), or 60 minutes with Round 2 added.
60 minutes
1 class period
6 roles
Small (4 districts), Standard (5 districts), Full (6 districts)
5 objectives
5 standards aligned
Aligned to the CASEL framework's core competencies. These are the SEL skills students actively practice while playing.
6 roles across 2 factions. Each has different information, different goals, and different leverage. Click any role to see their background and what they are trying to accomplish.
Design flow 2.0 megalitres per day. Chemical feed room rebuilt eight years ago with two redundant metering pumps. Raw-water pH probe and a bench titration kit in the lab. Clearwell holds about four hours of finished water, so a bad batch is caught quickly or not at all.
Design flow 1.5 megalitres per day. Two 40-tonne dry-chemical silos plus a bagged-product store. Online pH and alkalinity analysers reporting every 30 seconds. Clearwell holds about 90 minutes of finished water.
Design flow 2.5 megalitres per day, the largest on the system. Draws from the eastern channel below the ledge. About 190 kilometres of distribution main, some of it cast iron installed before 1940. Corrosion control is a standing operational concern in any pH excursion.
Design flow 1.8 megalitres per day. Intake below a slow oxbow, so an upstream plume arrives later and flatter. Jar-test bench with a six-place gang stirrer. Lime silo plus a bagged-product store for alternate reagents.
Design flow 3.0 megalitres per day, the largest volume treated on the system. Chronically elevated raw-water turbidity from the clay shoal. Largest coagulant feed on the system. Two-stage flocculation basins.
Design flow 2.2 megalitres per day. Furthest downstream intake on the system. Outfall discharges to the river below the plant, and that discharge is not scored by anyone in this simulation. Bench titration kit and an online pH probe.
One click on the teacher dashboard prints a dossier for every role - background, goals, key facts, and their confidential briefing - plus the primary-source packet and a vocabulary sheet. Print them, or save as PDF, so each student reads their role on paper instead of huddling around one screen. The app still runs the votes and the action; the paper just carries the reading.
Every role includes real historical documents. Students read them because they need the information to make their case.
Get free teacher access in 30 seconds. No account needed - just a passcode that unlocks the full game library, teacher guides, and session tools.