All simulations

First Drop

Buy the height, spend it wisely, and land the train - three roller-coaster contracts where conservation of energy is the whole game.
Get the Teacher Code - Free Already have the code? Go to your dashboard →
Physics / Physical Science Grades 9-11 6 roles 58 min 1 class period
Physics / Physical Science Grades 9-11 6 roles 58 min 1 class period
Gullwing Point, a seaside amusement park rebuilding after decades of decline. Its board issues three construction contracts across the season - a family coaster, a wooden boardwalk revival, and a flagship steel looper - and rival engineering firms bid on every one. The chain lift is the only energy the train will ever have; every meter of track spends it.

Compete as rival roller-coaster engineering firms bidding for park contracts - use conservation of energy to design a ride that hits the advertised top speed, survives the g-force inspection, and clears the thrill rating without blowing the construction budget.

Get Free Teacher Access Already have access? Go to Dashboard

Class Time

58 minutes

Designed For

1 class period

Roles

6 roles

Class Sizes

Core (4 firms), Standard (5 firms), Full (6 firms)

Learning Objectives

6 objectives

Standards

6 standards aligned

Where This Fits in Your Curriculum

Run this inside the energy unit, right after conservation of mechanical energy, when students already know that a lifted mass stores energy and that the store converts to speed. Algebra and a square root are the required math. They do not need calculus, momentum, or a finished circular motion unit; the g-force formula is handed to them on the worksheet, and its meaning gets taught by the safety inspection failing. What it teaches is energy accounting: the chain lift is the only energy the train will ever have, friction charges rent every meter of track, and no hill downstream can be taller than the first drop. Teams feel that constraint before they can state it. It fits physics first, conceptual physics with the paper worksheet, and AP Physics 1 as a Unit 3 review that reuses centripetal acceleration.

What Students Will Learn

Social & Emotional Learning (CASEL)

Aligned to the CASEL framework's core competencies. These are the SEL skills students actively practice while playing.

Flexible Class Sizes

Core (4 firms)
Four firms with contrasting engineering philosophies - a safety-record shop, an ex-aerospace crew, a scrappy newcomer, and a speed-first shop. Best for 12-20 students (3-5 per firm).
Standard (5 firms)
Adds an airtime specialist that competes on floater hills rather than raw speed, widening the range of winning shapes. Best for 15-25 students.
Full (6 firms)
Adds a precision shop that wins on profit margin by building exactly to spec and nothing more - the sixth distinct strategy. Best for 18-30 students.

How the Game Plays Out

Turn 1: County Fair
The Energy Audit
"How much lift height do you need to hit the advertised top speed - and how much does friction take back before the station?"
Turn 2: Boardwalk Revival
The Wood Changes Everything
"Wood has more friction than steel - how does that change the height you need and the speed you arrive with?"
Turn 3: The Flagship
The Loop and the Teardrop
"How do you enter a loop slow enough to survive the bottom g-forces but fast enough to clear the top?"

Roles Your Students Will Play

Click any role to see their background and what they are trying to accomplish.

Keel Coaster Works
Keel is the veteran shop at the table - decades of contracts and not one ride ever shut down by an inspector. Its engineers build well inside the safety envelope and treat a red-tag as a failure worse than losing a bid. Steady, conservative, and quietly proud of it.

Founded 2003. Twenty-two seasons without a single ride red-tagged by an inspector. Builds with a comfortable margin under every g-force limit. Starting working capital: $20,000.

Goals
  • Finish the season with the highest working capital
  • Never fail an inspection - a passing bid every round beats a spectacular gamble
  • Win on reliability: prove every g-force on the worksheet before you submit
Vanguard Dynamics
Vanguard was founded by former aerospace engineers who treat a coaster the way they once treated a flight envelope - every node checked before a single beam is welded. They would rather solve the energy audit by hand and confirm with one test than test their way to an answer. Rigorous to the point of stubbornness.

Founded by former aerospace engineers. Treats every ride as a flight envelope, checking each node before the train is built. Prefers to solve the energy audit by hand, then confirm with a single test. Starting working capital: $20,000.

Goals
  • Finish the season with the highest working capital through precise calculation
  • Spend as few wind-tunnel tests as possible by computing first and testing to confirm
  • Win on accuracy - and collect the prediction bonus every round
Switchback Rail
Switchback is two seasons old, a small crew that survived its first contracts by reading the RFP closer than anyone bigger. It cannot outspend the veterans, so it out-reads them - bidding exactly what the park asked for and nothing it will not pay for. Hungry and quick to learn.

Two seasons old. Small crew, big appetite. Survived early contracts by reading the RFP more carefully than larger rivals. Starting working capital: $20,000.

Goals
  • Win at least one contract outright and prove the shop belongs at the table
  • Escalate carefully - a safe first contract funds a bolder flagship
  • Out-read the veterans by matching the design to the RFP, not to your pride
Freefall Works
Freefall believes the first drop sells the ticket. It builds tall, drops hard, and lets conservation of energy do the rest, chasing top speed and the thrill of the plunge. Bold, a little theatrical, and always the firm with the biggest lift hill on the skyline.

Speed-first shop. Believes the first drop sells the ticket. Builds tall, drops hard, and lets conservation of energy carry the rest of the ride. Starting working capital: $20,000.

Goals
  • Maximize top speed and descent thrill, then convert it to the highest bankroll
  • Clear every contract's advertised top speed with margin to spare
  • Win the flagship, where height and speed pay the most
Crestline Engineering
Crestline made its name on airtime - the weightless float over a hill crest that lifts riders out of their seats. It knows the crest g-force math cold and believes riders remember the float, not the height. Precise where Freefall is loud.

Made its name on airtime - the weightless float over a hill crest. Knows the crest g-force formula cold. Believes riders remember the float, not the raw height. Starting working capital: $20,000.

Goals
  • Maximize thrill through well-tuned airtime hills rather than raw speed
  • Hit the thrill floor efficiently without overbuilding past the cap
  • Win the markets that reward floaters - especially the ejector-friendly flagship
Camber and Grade
Camber is a precision shop obsessed with profit margin. It builds exactly what the RFP pays for and not a meter more, winning by spending less rather than thrilling more. Where others chase spectacle, Camber chases the difference between payout and cost.

Precision shop obsessed with profit margin. Builds exactly what the RFP pays for and not a meter more. Wins by spending less, not by thrilling more. Starting working capital: $20,000.

Goals
  • Maximize profit margin - the gap between payout and construction cost - every round
  • Clear the thrill floor at the lowest possible cost
  • Never overbuild past the thrill cap the park will pay for

Hand Each Student Their Own Sheet

One click on the teacher dashboard prints a dossier for every role - background, goals, key facts, and their confidential briefing - plus the primary-source packet and a vocabulary sheet. Print them, or save as PDF, so each student reads their role on paper instead of huddling around one screen. The app still runs the votes and the action; the paper just carries the reading.

Primary Sources

Every role includes real historical documents. Students read them because they need the information to make their case.

The Flip Flap Railway and the Problem of the Circular Loop (summary)
The Loop the Loop patent: a loop that is not a circle
Roller Coasting Structure (the Switchback Railway)
How the Coast Works: the chain lift, then gravity

Key Terms Students Will Learn

kinetic energypotential energymechanical energyconservation of energyfrictiondissipationworkjouleg-forcecentripetal accelerationradius of curvaturevelocityclothoidairtimetrim brakeRFPprofit margininsolvent

After the Game: Debrief Questions

  1. Where did the energy go? Every train is lifted once and then coasts. Pick one coaster your firm designed and trace it from the top of the lift to the station - where did its energy turn into speed, and where did it get spent?
  2. If the park ran any bids, compare the best and the worst bid in each round. What separated them - was it a design choice, a math error, or reading the RFP wrong?
  3. In 1895 the Flip Flap Railway used a perfectly circular loop and hurt riders' necks. Using what you know about loops, explain why a circle is dangerous and why the teardrop shape fixed it.
  4. Only the first drop could deliver the advertised top speed - no later hill could speed the train back up past it. Why is that true, and what does it tell you about how a coaster stores and spends energy?
  5. You each got only two free wind-tunnel tests before extras cost 3,000 dollars. How did that scarcity change how your firm worked?
  6. The park paid for spec-fit, not for the tallest or most expensive coaster. Where else in the real world do you have to build exactly to a specification rather than as big as possible?

Ready to run this in your classroom?

Get free teacher access in 30 seconds. No account needed - just a passcode that unlocks the full game library, teacher guides, and session tools.