A state fisheries biologist just confirmed it: Stoneback in the Crestwater River. Six teams manage different parts of the reserve. Each team holds private monitoring data about their zone. Nobody has the complete picture. The Stoneback is already spreading faster than anyone realizes - but only by sharing data will any team understand how far the cascade has already gone.
56 minutes
1 class period
6 roles
Core (4 groups), Standard (5-6 groups), Full (6 groups)
6 objectives
5 standards aligned
Aligned to the CASEL framework's core competencies. These are the SEL skills students actively practice while playing.
6 roles across 2 factions. Each has different information, different goals, and different leverage. Click any role to see their background and what they are trying to accomplish.
ELECTROFISHING SURVEY - Crestwater River Main Channel (conducted 14 days ago) Stoneback population estimate: 340-480 individuals in main channel (high confidence) Stoneback juveniles confirmed: yes - active reproduction underway Estimated doubling time: 8-10 weeks under current conditions Native fish status: - Creek chub: 23% of 3-year baseline (critical decline) - Largemouth bass adult catch rate: down 31% from prior year - Largemouth bass juvenile catch rate: down 68% from prior year - Bluegill: holding at 74% of baseline (declining) - Crayfish: 61% of baseline (declining) Biologist field note: 'The creek chub collapse is faster than our models predicted. At current rates, the channel chub population may be functionally absent within 6-8 weeks. Whatever depends on creek chub as a prey source is already feeling this upstream of where we can measure it.'
AMPHIBIAN BREEDING SURVEY - Crestwater Wetland Complex (conducted 3 weeks ago) Bullfrog call index: 40% decline vs. 3-year baseline (significant) Green frog index: 28% decline vs. 3-year baseline (notable) Spring peeper: holding (less susceptible - eggs deposited before Stoneback arrived) Citizen monitoring note (submitted last week): 'Spotted large unfamiliar fish in inlet channel, approximately 18 inches, dark mottled coloring, aggressive behavior near nest site. Does not match any fish in my field guide. Reporting as unusual sighting.' Habitat connectivity map showing three water corridors: - Corridor A (northern inlet): 2.1m wide, perennial flow, HIGH RISK - direct river connection - Corridor B (central marsh channel): 0.8m wide, seasonal flow, MEDIUM RISK - floods during wet events - Corridor C (southern drainage ditch): 1.4m wide, perennial flow, MEDIUM-HIGH RISK Note: Stoneback can traverse Corridor B during flood events even when normally dry.
AUDUBON CHAPTER NESTING REPORT - Crestwater Great Blue Heron Colony (current season) Colony established: 14 years, same stand of mature cottonwood trees Total active nests this season: 31 (down from 38 prior year) Nests abandoned post-hatching: 12 (39% of nests - unprecedented) Fledgling survival to banding: 60% of expected (down 40% from 3-year average) Osprey monitoring (3 nests along river corridor): - Nest 1: feeding frequency reduced, chick weight BELOW normal threshold - Nest 2: feeding frequency reduced, chick weight BELOW normal threshold - Nest 3: feeding frequency normal, chick weight normal Biologist field note: 'Heron and osprey foraging disruption is consistent with prey fish decline in the main channel and wetland margins. Cannot confirm cause without fish survey data. Recommend cross-referencing with aquatic zone monitoring immediately. Fledgling cohort for this season may be a total loss if foraging conditions do not improve within 2 weeks.' Note on your zone: When you share this data with Aquatic Zone and learn about the creek chub collapse, the connection will be unmistakable.
CAMERA TRAP DATA - Upland Fringe Zone (full season) Mink activity at vernal pool outlet: DOWN 60% vs. prior year (significant decline) Great blue heron visits to vernal pool: 0 this season (down from regular weekly visits) Raccoon visits to vernal pool: 0 this season (unexplained) Muskrat: present and active (consistent with prior years) Beaver activity: present in main drainage channel CAMERA IMAGE (spring flood event, 6 weeks ago): 'Large dark-mottled fish, estimated 16-18 inches, observed in vernal pool during flood inundation period. Aggressive posture observed near pool edge. Species not identified in field. Image quality limited by lens condensation. No formal report filed - awaiting species confirmation.' Current vernal pool status: still holding water (delayed dry-down due to wet spring) Connection to main drainage: CURRENTLY DISCONNECTED (dry upland gradient between pool and wetland) Flood connection: reconnects during high-water events (expected 1-2 times per year) Note: If the fish in this image is Stoneback, this pool has been colonized for 6 weeks. It will reconnect to the wetland system during the next flood event.
eDNA SURVEILLANCE - Wildlife Corridor (5 monitoring points, sampled 10 days ago) Point 1 (river interface): Stoneback eDNA CONFIRMED - high concentration Point 2 (lower corridor): Stoneback eDNA CONFIRMED - moderate concentration Point 3 (culvert crossing): Stoneback eDNA CONFIRMED - low concentration Point 4 (upper corridor): Stoneback eDNA CONFIRMED - trace level (recent arrival) Point 5 (headwaters): Stoneback eDNA NOT DETECTED - currently clean Native fish eDNA diversity index: - Points 1-2: declining (21% below baseline) - Points 3-4: holding (5% below baseline) - Point 5: normal Otter camera trap data: - Point 3: otter activity DOWN 35% from prior year - Point 5: otter activity normal Barrier cost estimate (point 3 culvert): - Electric barrier: $4,200 installation, stops Stoneback movement - Physical weir: $6,800 installation, more permanent - PERMANENT COST: both options block native fish migration through this culvert - State permit required (6-8 weeks) - available Round 2+ - Wildlife Corridor must confirm barrier location using eDNA data - cannot place blindly Key decision: If barrier is placed at point 3, Stoneback cannot reach Point 5 headwaters. Native fish also cannot use this corridor to migrate to headwaters spawning areas.
STATE WILDLIFE AGENCY MEMO - Crestwater Reserve Management Formal Stoneback (Channa stonei) identification: CONFIRMED Confirmation date: 14 days ago Source of introduction: unknown (suspected aquarium release from pet trade) AUTHORIZATION MATRIX: - Electrofishing / Physical Removal: Reserve can self-authorize. Available immediately. - Barrier Installation: State permit required (DNR Form 44-B). Processing: 6-8 weeks. Available in the game from Round 2. - Coordinated Monitoring (eDNA + electrofishing): Self-authorize. Available immediately. - Habitat Restoration: Self-authorize. Available immediately. - Rotenone Treatment (piscicide): Requires state authorization + federal EPA notification. Timeline: 10-12 weeks. EARLIEST AVAILABILITY: Round 4. Will require public comment period. RESERVE RESPONSE FUND: 8 points each round, shared by every zone. Every zone submits one recommendation per round on its Recommendations tab. Each one is that zone's action. Your Dashboard adds up the points. If the total is over 8, zones must change theirs. An action the fund cannot cover does nothing. Lead the room to a plan that fits. NOTE: Adjacent watershed (Clearwater Reservoir): Unconfirmed Stoneback sighting reported last month. Investigation pending. If confirmed, re-seeding risk must be factored into long-term strategy.
One click on the teacher dashboard prints a dossier for every role - background, goals, key facts, and their confidential briefing - plus the primary-source packet and a vocabulary sheet. Print them, or save as PDF, so each student reads their role on paper instead of huddling around one screen. The app still runs the votes and the action; the paper just carries the reading.
Every role includes real historical documents. Students read them because they need the information to make their case.
Get free teacher access in 30 seconds. No account needed - just a passcode that unlocks the full game library, teacher guides, and session tools.